Evaluation of erosion control BMPs on ditched haul road stream crossing approaches following reconstruction

This article is part of a larger document. View the larger document here.

  • Authors: Lang, A.J.; Aust, W.M.; Bolding, M.C.; Schilling, E.B.
  • Publication Year: 2016
  • Publication Series: Proceedings - Paper (PR-P)
  • Source: In: Proceedings of the 18th biennial southern silvicultural research conference. e-Gen. Tech. Rep. SRS-212. Asheville, NC: U.S. Department of Agriculture Forest Service, Southern Research Station. 614 p.

Abstract

Ditched forest roads leading to stream crossings and used for log transportation have recently been a topic of water quality concern and legal controversy. Best management practices (BMPs) can reduce potential water quality issues, yet few research studies have quantified BMP costs and reductions in sediment from implementing specific ditch BMPs. Researchers reconstructed fifty 15.2 m sections of ditches at stream crossings or cross drains and applied one of five treatments. Treatments were replicated 10 times and split by two slope classes in a completely randomized design. Silt fence traps were placed at the end of each ditch section prior to stream crossings or culvert inlets. Sediment pins were installed adjacent to the silt fence and sediment deposit depths were measured 42 days following ditch re-construction. Field based results show that median erosion rates were greatest for the Bare (48.0 Mg ha-1 yr-1), followed by Seeded (25.0 Mg ha-1 yr-1), Check Dams (22.2 Mg ha-1 yr-1), Completely Rocked (2.6 Mg ha-1 yr-1), and Seeded with Erosion Mat (2.1 Mg ha-1 yr-1). Results from the Kruskal-Wallis statistical test showed that the Bare treatments had significantly greater erosion rates from Completely Rocked and Seeded with Erosion Mat treatments. Cost of BMP treatment was cheapest for Seeded ($9), followed by Seeded with Erosion Mat ($24), Check Dams ($45.40), and Completely Rocked ($119.50). Study results suggest that re-constructed ditches should drain short sections of road and should contain some erosion control BMP in order to reduce erosion and sediment delivery

  • Citation: Lang, A.J.; Aust, W.M.; Bolding, M.C.; Schilling, E.B. 2016. Evaluation of erosion control BMPs on ditched haul road stream crossing approaches following reconstruction. In: Proceedings of the 18th biennial southern silvicultural research conference. e-Gen. Tech. Rep. SRS-212. Asheville, NC: U.S. Department of Agriculture Forest Service, Southern Research Station. 614 p.
  • Posted Date: February 3, 2016
  • Modified Date: March 9, 2016
  • Print Publications Are No Longer Available

    In an ongoing effort to be fiscally responsible, the Southern Research Station (SRS) will no longer produce and distribute hard copies of our publications. Many SRS publications are available at cost via the Government Printing Office (GPO). Electronic versions of publications may be downloaded, printed, and distributed.

    Publication Notes

    • This article was written and prepared by U.S. Government employees on official time, and is therefore in the public domain.
    • Our online publications are scanned and captured using Adobe Acrobat. During the capture process some typographical errors may occur. Please contact the SRS webmaster if you notice any errors which make this publication unusable.
    • To view this article, download the latest version of Adobe Acrobat Reader.